Bukit Tempayan Reservoir And Sg. Sayong Sludge Treatment Facility

Proposed Sg. Rengit / Pengerang Distribution Improvement, including rehabilitation of the Bukit Tempayan reservoir and upgrades to the Sg. Sayong sludge treatment facility, is aimed at strengthening and improving the reliability of the regional water supply system. RK Partnership provided quantity surveying and cost consultancy services to support cost planning, tender documentation and cost control across the related infrastructure works.

Sekolah Kebangsaan Putra Height 2

Proposed IBS (Industrialised Building System) project for Sekolah Kebangsaan Putra Height 2 involving the construction of 18 classrooms and supporting school facilities in Subang Jaya, Selangor. RK Partnership provided quantity surveying and cost consultancy services to support cost planning, tender documentation and cost control, ensuring the school development is delivered efficiently and in line with Ministry of Education requirements.

Covered Pedestrian Walkway and Footbridge Upgrading, Chow Kit–HKL, Kuala Lumpur

This project provides a covered pedestrian walkway linking Chow Kit Monorail Station to Hospital Kuala Lumpur (HKL) via Jalan Pahang and Jalan Raja Muda Abdul Aziz, along with upgrading works to existing pedestrian bridges in the surrounding area. RK Partnership provided quantity surveying and cost consultancy services to support cost planning, tender documentation and cost control, helping to deliver safer and more convenient pedestrian access between public transport and the hospital.

Proposed Sg. Rengit/ Pengerang Distribution Bukit Tempayan Package 1

Proposed Sg. Rengit / Pengerang Distribution Bukit Tempayan Package 1 involves the construction and completion of a 2ML reservoir at Bukit Tempayan to strengthen the local water distribution system. RK Partnership provided quantity surveying and cost consultancy services to support cost planning, tender documentation and cost control for the project.

Proposed Sg. Rengit/ Pengerang Distribution Bukit Tempayan Package 2

Proposed Sg. Rengit / Pengerang Distribution Bukit Tempayan Package 2 involves the construction and completion of the Sg. Sayong sludge treatment facility and related works to support a more reliable and efficient water supply system for the surrounding areas. RK Partnership provided quantity surveying and cost consultancy services to assist with budgeting, tender documentation and cost control throughout the project.

River Of Life Project, Kuala Lumpur

Works to control river water quantity and quality, drainage systems and flood retention ponds under the River of Life project in Kuala Lumpur, aimed at improving flood management and river conditions in the city. RK Partnership provided quantity surveying and cost consultancy services to support budgeting, tender documentation and cost control for these civil and infrastructure works.

Pusat Dagangan Antarabangsa Melaka (MITC)

A proposed mixed development comprising a 5-star hotel, standalone restaurant and SOHO units within the MITC precinct at Ayer Keroh, Melaka. RK Partnership provided quantity surveying and cost consultancy services to support budgeting, tender documentation and cost control, helping to ensure the project remains commercially viable while meeting the operator’s functional and branding requirements.

Rumah Keluarga Angkatan Tentera (RKAT), Kem Tok Jalai

Construction of multi-class Armed Forces Family Housing (RKAT) at Kem Tok Jalai, Alor Setar is intended to provide more comfortable and organised accommodation for military personnel and their families. RK Partnership’s scope included the preparation of Bills of Quantities and related cost documents to support the tender process, price comparison and cost control throughout the project.

SMK Seri Sentosa, Kuala Lumpur

The proposed construction and completion of SMK Seri Sentosa in Kuala Lumpur involves developing a new secondary school to provide a more comfortable and well-planned learning environment for students and staff. RK Partnership provides quantity surveying and cost consultancy services to assist with budget planning, tender documentation and construction cost control so that the project is delivered efficiently and meets the requirements of the Ministry of Education.

Sekolah Jenis Kebangsaan (Cina) Yong Peng 2

Cadangan membina dan menyiapkan 18 bilik darjah Sekolah Jenis Kebangsaan (Cina) Yong Peng 2 menggunakan sistem binaan berindustri (IBS) ini bertujuan menambah kapasiti dan menaik taraf kemudahan pembelajaran di kawasan Batu Pahat. RK Partnership menyediakan khidmat ukur bahan dan perundingan kos untuk memastikan projek ini dirancang secara berkesan, berdaya maju dari segi kos dan dilaksanakan mengikut keperluan fungsian serta standard pendidikan semasa.